Energy Storage Solutions
  • About
  • Buildings
  • Homes
    • Eligible Contractors and Third-Party Owners 
    • Eligible Equipment
    • Homeowner FAQ
    • Informational Webinars
  • Find a Contractor
  • For Contractors
    • Eligible Equipment
    • Open Office Hours for Contractors
    • Technology Application
  • Reporting
  • Contact
    • Search for:
  • About
  • Buildings
  • Homes
    • Eligible Contractors and Third-Party Owners 
    • Eligible Equipment
    • Homeowner FAQ
    • Informational Webinars
  • Find a Contractor
  • For Contractors
    • Eligible Equipment
    • Open Office Hours for Contractors
    • Technology Application
  • Reporting
  • Contact

If a Commercial and Industrial (C&I) site already has an on-site backup generator, why would islanding be a requirement?

June 24, 2022 admin
A

If a Commercial and Industrial (C&I) site already has an on-site backup generator, why would islanding be a requirement?

To prevent back feeding onto the grid for protection of utility workers and to meet the resiliency requirements as directed in the PURA Final Decision.

    admin   June 24, 2022

Post navigation

  Are there any islanding/microgrid requirements for participants?
  What is a “priority” customer?

This program is overseen by the Public Utilities Regulatory Authority (PURA), is paid for by electric ratepayers, and is administered by the Connecticut Green Bank, Eversource, and UI.

    • About
    • Buildings
    • Homes
    • Find a Contractor
    • For Contractors
    • Reporting
    • Contact

    Copyright © 2023 Energy Storage Solutions Administrators. All rights reserved.